Close Menu

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    Papa Johns teams up with Disney and Pixar for Toy Story 5

    August 7, 2026

    China tightens drone exports in wider US countermeasures

    August 6, 2026

    Kleen Hy-Dro-Gen Inc. Is Pleased to Announce Dual ISO 9001:2015 and TSSA Certifications, Bolstering Operational Quality and Technical Safety Governance

    August 5, 2026
    Trending
    • Papa Johns teams up with Disney and Pixar for Toy Story 5
    • China tightens drone exports in wider US countermeasures
    • Kleen Hy-Dro-Gen Inc. Is Pleased to Announce Dual ISO 9001:2015 and TSSA Certifications, Bolstering Operational Quality and Technical Safety Governance
    • Talos Integrates with STS Digital to Bring Institutional Crypto Options and Spot Liquidity to its Provider Network
    • OECD inflation eases to 4.2% as lower energy rates take hold
    • Moderna begins Ebola vaccine trial amid DR Congo outbreak
    • Guatemala raises red alert as Fuego volcano erupts
    • Oil prices fall as Brent and WTI reach three-week lows again
    • Home
    • Contact Us
    Straits TigerStraits Tiger
    Saturday, August 8
    • Automotive
    • Business
    • Entertainment
    • Health
    • Lifestyle
    • Luxury
    • News
    • Sports
    • Technology
    • Travel
    Straits TigerStraits Tiger
    Home » HostDime’s Next-Gen, Tier IV Data Centers Support AI Workloads With Up to 100kW Per Rack
    ACCESS Newswire

    HostDime’s Next-Gen, Tier IV Data Centers Support AI Workloads With Up to 100kW Per Rack

    October 12, 2023
    Facebook WhatsApp Twitter Pinterest LinkedIn Telegram Tumblr Email Reddit VKontakte

    ORLANDO, FL / ACCESSWIRE / October 11, 2023 / HostDime’s Tier IV Data Centers, including their new flagship facility in Orlando, are setting industry design standards that will power the new era of infrastructure needed for artificial intelligence (AI), Machine Learning (ML) technologies, and other high-performance computing (HPC) workloads. These next-gen data centers boast an astonishing power density of up to 100kW per rack, a significant leap from the traditional 3kW to 20kW in legacy data centers.

    AI has transcended its status as a buzzword and has quickly become a transformative force across industries. For AI to achieve its potential, it requires massive computational power. Complex neural networks and deep learning algorithms require specialized high-performance hardware, including CPUs, GPUs, and TPUs, optimized for parallel processing, complex modeling, and accelerated training. Suddenly the industry as a whole is rethinking how data centers are designed. A new generation of purpose-built data centers is the only way to power this new wave of hardware infrastructure.

    Addressing this need head-on, ahead of the market, is HostDime’s hyper-edge, Tier IV data center design, which is being deployed at the global edge with immediate deployments in Latin America (most recently in Colombia) and at their flagship facility in Florida. HostDime’s leap to up to 100kW signifies a remarkable advancement that directly addresses the energy demands of AI/ML/HPC workloads. This state-of-the-art Orlando data center brings to market much-needed high-power-density inventory while reducing dependency on data center infrastructures in traditional major metro markets that are struggling to keep up with demand. This infrastructure demand is also being seen at the global edge where HostDime will continue to deploy its next-gen, Tier IV design.

    HostDime’s modular design incorporates a high watt-per-square-foot density along with supplemental in-row cooling capabilities that work in parallel with direct-to-chip cooling technologies. The design also incorporates precise cooling-efficient cold aisle containment at every data hall. HostDime’s flagship Orlando data center also has designated data halls created specifically for immersive cooling hardware. Immersive cooling is widely becoming a necessity in the new wave of data center build-outs. All these features are at the forefront of HostDime’s data center design.

    HostDime’s commitment to building the next generation of purpose-built data centers is embodied by their standard Tier IV design – the pinnacle of reliability. This designation signifies fault tolerance and redundancy at every level, allowing HostDime to offer 100% uptime SLAs. Such data center infrastructure is imperative for supporting critical AI workloads that require uninterrupted availability to perform mission-critical tasks.

    As AI continues to reshape businesses as we know it, the role of data centers cannot be overstated. The new Central Florida data center, which will be commissioned in Q1 2024, is poised to meet the skyrocketing demands of the AI revolution. The future is AI-powered, and HostDime’s global edge data centers are the gateway to that future.

    About HostDime:

    HostDime is a hyper-edge global data center company operating our owned, purpose-built data center facilities in Mexico, Brazil, Colombia, and our flagship facility in Florida, USA, and with owned networks in the UK, India, and Hong Kong. Our mission is to design, build, and operate purpose-built, next-gen data center facilities at the global edge.

    We offer an array of core digital infrastructure products and services, including colocation (private data center suites, cages, racks), interconnection (cross-connects, peering, transit), Hardware-as-a-Service (bare metal servers, lease-to-own servers, hardware procurement), cloud infrastructure (private, hybrid, multi-cloud), and managed services (server management, remote hands, smart hands).

    Contact Information

    Jared Smith
    Director of Marketing
    jared.s@hostdime.com
    386-341-0855

    Related Images

    SOURCE: HostDime

    View source version on accesswire.com:
    https://www.accesswire.com/792083/hostdimes-next-gen-tier-iv-data-centers-support-ai-workloads-with-up-to-100kw-per-rack

    Related Posts

    Kleen Hy-Dro-Gen Inc. Is Pleased to Announce Dual ISO 9001:2015 and TSSA Certifications, Bolstering Operational Quality and Technical Safety Governance

    August 5, 2026

    Driving the World’s Leading Supply Chains: 9 OMP Customers Named to The 2026 Gartner Top 25

    June 19, 2026

    GA-ASI and INTEC Group Sign MOU at ILA Berlin

    June 12, 2026

    GA-ASI Completes First Flight of MQ-9B With AEW Pods

    May 21, 2026

    Redington MD and Group CEO V.S. Hariharan Appointed to GTDC Executive Committee

    May 12, 2026

    Transoft Solutions Acquires CADaptor Solutions

    May 6, 2026
    Latest News

    China tightens drone exports in wider US countermeasures

    August 6, 2026

    OECD inflation eases to 4.2% as lower energy rates take hold

    August 5, 2026

    Moderna begins Ebola vaccine trial amid DR Congo outbreak

    August 5, 2026

    Guatemala raises red alert as Fuego volcano erupts

    August 5, 2026

    Oil prices fall as Brent and WTI reach three-week lows again

    August 5, 2026

    Eastern Washington fires leave 700 structures destroyed

    August 4, 2026

    Michigan reports first deaths tied to cyclospora outbreak

    August 4, 2026

    Oil prices swing after Brent tops $90 on supply strains

    August 3, 2026

    Austria sets July heat record amid €1.4 billion losses

    August 3, 2026
    © 2026 Straits Tiger | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.